Emerson Process Management MMI-20020979 Carbon Monoxide Alarm User Manual


 
4 Grounding
The meter must be grounded according to the standards that are applicable at the site.
The customer is responsible for knowing and complying with all applicable standards.
Prerequisites
Micro Motion suggests the following guides for grounding practices:
In Europe, EN 60079-14 is applicable to most installations, in particular Sections
12.2.2.3 and 12.2.2.4.
In the U.S.A. and Canada, ISA 12.06.01 Part 1 provides examples with associated
applications and requirements.
For IECEx installations, IEC 60079-14 is applicable.
If no external standards are applicable, follow these guidelines to ground the meter:
Use copper wire, 18 AWG (0.75 mm
2
) or larger wire size.
Keep all ground leads as short as possible, less than 1 Ω impedance.
Connect ground leads directly to earth, or follow plant standards.
CAUTION!
Ground the meter to earth, or follow ground network requirements for the facility. Improper
grounding can cause measurement error.
Procedure
Check the joints in the pipeline.
- If the joints in the pipeline are ground-bonded, the sensor is automatically grounded
and no further action is necessary (unless required by local code).
- If the joints in the pipeline are not grounded, connect a ground wire to the grounding
screw located on the sensor electronics.
Grounding
32 Micro Motion
®
Gas Density Meters