Vermont Casting MSZ-D36NA Air Conditioner User Manual


 
32
OPERATING PROCEDURE
PHOTOS
3. Removing the nozzle assembly
(1) Remove the panel and the corner box. (Refer to 1.)
(2) Remove the electrical cover. (Refer to 2.)
(3) Remove the electrical side cover, disconnect the vane
motor connector.
(4) Pull out the drain hose from the nozzle assembly, and
remove the nozzle assembly.
4. Removing the vertical vane motor
(1) Remove the nozzle assembly. (Refer to 3.)
(2) Remove the crank of the vertical vane motor unit from the
vertical vane.
(3) Remove the screw of the vertical vane motor unit, and pull
the vertical vane motor unit.
(4) Remove the screws of the vertical vane motor unit cover.
(5) Remove the crank of the vertical vane motor unit from the
shaft of the vertical vane motor.
(6) Remove the vertical vane motor from the vertical vane
motor unit.
(7) Disconnect the connector of vertical vane motor from the
vertical vane motor.
5. Removing the horizontal vane motor
(1) Remove the nozzle assembly. (Refer to 3.)
(2) Remove the screws of the horizontal vane motor unit, and
pull out the horizontal vane motor unit.
(3) Disconnect the connector from the horizontal vane motor.
(4) Remove the screws of the horizontal vane motor.
(5) Remove the horizontal vane motor.
Photo 3
Screw of electrical
box
Photo 4
Screws of the vertical
vane motor unit
Crank of the vertical
vane motor unit
Screws of the vertical vane motor unit cover
Photo 5
Crank of the vertical
vane motor unit
Screws of the vertical
vane motor unit
Screws of the vertical vane motor unit cover
Photo 6
Screws of the horizontal vane motor unit
Screws of the
horizontal vane
motor