Bradley Smoker SS-2/IR/JUV Plumbing Product User Manual


 
7
Express® Lavatory System SS-Series
Installation Instructions - For Service Only SS-2/IR/STD, SS-2/IR/JUV
Bradley Corporation • 215-1243 Rev. D; EN 03-813 5/11/04
Installation Instructions
continued . . .
Step 1: Rough in
continued . . .
IMPORTANT: Turn OFF electrical power to the outlet when installing the
Express®.
3. Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 2.
4. Install (6) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by
installer) at the locations shown in Figures 1a or 1b on pages 5-6.
NOTE: The anchors will be used to mount the Express® bowl and frame to the wall.
Installation Instructions
continue . . .
1-1/2" NPT DRAIN -
STUB OUT
110 Volt GFCI
ELECTRICAL
OUTLET
1/2" NPT HOT AND
COLD SUPPLIES
OR TEMPERED
SUPPLY - STUB
OUT
Figure 2