Bosch Appliances 24i junior Boiler User Manual


 
CLEANING PRIMARY SYSTEMS
BEFORE CLEANING THE SYSTEM:
ENSURE THE SYSTEM AND PIPEWORK IS
IN GOOD WORKING ORDER
KEEP THE EXISTING BOILER/
CIRCULATING PUMP WHERE POSSIBLE
OR USE A POWER FLUSHING MACHINE
TO AID THE CLEANSING PROCEDURE
BEFORE INSTALLING A NEW BOILER.
CLEANING THE PRIMARY SYSTEM:
1 Fill the system with cold water and
check for leaks.
2 Open all drain cocks and drain the
system.
3 Close drain cocks and add a suitable
flushing agent compatible with
aluminium at the correct strength for
the system condition in accordance with
the manufacturer's instructions.
The PH value of the system water
must be less than 8 or the appliance
guarantee will be invalidated.
Circulate the flushing agent before the
boiler is fired up.
4 Run the boiler/system at normal operating
temperature as directed by the manufacturer
of the flushing agent.
5 Drain and thoroughly flush the system to
remove the flushing agent and debris.
IMPORTANT: All the following Pre-Installation sections must be read and
requirements met before starting boiler or flue installation.
CAUTION: ISOLATE THE MAINS SUPPLIES BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
IMPORTANT: Debris from the system can
damage the boiler and reduce efficiency.
Failure to comply with the guidelines for
the use of water treatment with the
appliance will invalidate the appliance
warranty.
CLEANING PRIMARY SYSTEMS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 24 i junior/28 i junior
8 716 107 336b (11/05)
8
PRE -
INSTALLATION