A SERVICE OF

logo

18
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
SEC
2” x 6”
Boards
120”
96”
89”
A
B
2” x 6” x 89”X.OTINCLUDED
2” x 4” x 120”X.OTINCLUDED
2” x 4” x 8’ Leveling Board (x1)
8d 1 1/2” Common Nail (x16)
(Not included)
Pea Gravel (9.8 Cubic Feet)
(Not included)
L-Bracket (x4)
(Not included)
1
ALTERNATIVE SITE PREPARATION: OPTION 2 - FILLED WOOD FRAME ASSEMBLY
Note: Whenever possible you should use the surfaces described on Page 7.
!
Note: All lumber must be rated for outdoor use.
!
SEC
1.5
SEC
1.6
SEC
1.7
Cut outside frame to 8’ x 10’ outside dimensions. Lay boards fl at so widest parts face up. Ensure frame is level.
Square up the frame by measuring from corner to corner. Measurement A should equal Measurement B. Nail an
L-Bracket on each corner of the frame with 8d nails. Place platform in the desired location. If platform does not
RESTLEVELONTHEGROUNDBUILDUPLOWPOINTSWITHLOOSEDIRTORh0EAvGRAVELUNTILPLATFORMISSTABLE
Once all boards are level and do not wobble,
PACKh0EAvGRAVELAROUNDTHEOUTSIDEOFTHE
frame, and slope away from frame.
.OWlLLTHEINSIDEOFTHEFRAMEWITHh0EAv
gravel. Use a leveling board to scrape off extra
ll material and to level the surface.
Front End