If a metal container is used, it is
necessary to ground the spray
gun and container. To do this,
hold a metal portion of the gun
against the edge of the metal
container. Failure to do so may
lead to static electric discharge,
which may cause a fire.
3. Turn the pressure control knob counterclockwise to the
lowest setting.
4. Set the PRIME/SPRAY valve to the PRIME.
5. Turn the ON/OFF switch to ON.
6. Turn the pressure control knob clockwise slowly until fluid
starts coming through the return tube. Use the least
amount of pressure necessary to keep the fluid flowing.
When all of the test fluid has been cleaned out of the
system, soapy water will flow through the return tube.
7. Turn the pressure control knob to its lowest setting and
replace the container of soapy water with a container of
clear water.
8. Turn the pressure control knob clockwise slowly until
water running through the return tube is clear.
9. Turn the pressure control knob counterclockwise to the
lowest setting. Replace the container of clean water with
a container of latex paint.
10. Turn the pressure control knob clockwise slowly until paint
comes through the return tube.
11. Place the return tube into the operating position above the
paint container. Keep recirculating paint through the
system until the paint coming through the return tube is
free of air bubbles.
12. Turn the pressure control knob counterclockwise to the
lowest setting. The unit is now ready to use.
Keep the spray gun locked and in the OFF position during
these steps.
CAUTION
PRIME
SPRAY
PRIME/SPRAY Valve
Pressure Control
Knob
WARNING
Purging the system for solvent-based paint
1. Place a container of paint under the paint suction tube.
Have a waste container ready to catch the purged fluid.
2. Detach the return tube from the fluid section and secure it
in the waste container so that it will not come out.
If a metal container is used, it is
necessary to ground the spray
gun and container. To do this,
hold a metal portion of the gun
against the edge of the metal
container. Failure to do so may
lead to static electric discharge,
which may cause a fire.
3. Turn the pressure control knob counterclockwise to the
lowest setting.
4. Set the PRIME/SPRAY valve to the PRIME.
5. Turn the ON-OFF switch to ON.
6. Turn the pressure control knob clockwise slowly until fluid
starts coming through the return tube. Use the least
amount of pressure necessary to keep the fluid flowing.
When all of the test fluid has been cleaned out of the
system, paint will flow through the return tube.
7. Turn the pressure control knob to its lowest setting.
8. Place the return tube into the operating position above the
paint container. Keep recirculating paint through the
system until the paint coming through the return tube is
free of air bubbles.
9. The unit is now ready to use.
PRIME
SPRAY
PRIME/SPRAY Valve
Pressure Control
Knob
WARNING
Return Tube
© SprayTECH Corporation. All rights reserved. 5
English