Vulcan-Hart ML-52201 Boiler User Manual


 
– 27 –
8. Disconnect the electrical wires.
9. Remove the blower and motor from the broiler.
10. Reverse the procedure to install.
IR1 and IR2(B)
WARNING: DISCONNECT THE ELECTRICAL
POWER TO THE MACHINE AND FOLLOW
LOCKOUT / TAGOUT PROCEDURES.
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
1. Remove the screws and the bracket and the
blower and motor.
2. Remove the screws and nuts from the air duct
and the blower and motor.
3. Carefully remove the screws from the blower
and motor and the brackets.
4. Carefully remove the air duct from the blower
and motor.
5. Note the location and connection of the
electrical wires.
6. Disconnect the electrical wires from the blower
and motor.
7. Remove the blower and motor from the broiler.
8. Reverse the procedure to install.
Blower Switch (GHIR44)
WARNING: DISCONNECT THE ELECTRICAL
POWER TO THE MACHINE AND FOLLOW
LOCKOUT / TAGOUT PROCEDURES.
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
1. Remove the manifold cover assembly as
outlined in Covers, Panels and Handles.
2. Remove the nut from the manifold cover
assembly and the switch.
3. Note the location and connection of the
electrical wires.
4. Disconnect the electrical wires.
5. Reverse the procedures to install.