Vulcan-Hart ML-52201 Boiler User Manual


 
– 20 –
2. Disconnect the oven burner valve from the
oven gas supply tube and the union.
3. Reverse the procedure to install.
Pilot Outage Protection Valve (GHCB40)
WARNING: SHUT OFF THE GAS BEFORE
SERVICING.
WARNING: ALL GAS JOINTS DISTURBED
DURING SERVICING MUST BE CHECKED FOR
LEAKS. CHECK WITH SOAP AND WATER
SOLUTION (BUBBLES). DO NOT USE AN OPEN
FLAME.
1. Remove the control panel cover as outlined in
Covers, Panels and Handles.
2. Remove the lower front panel as outlined in
Covers, Panels and Handles.
3. Disconnect the pilot valve tubing from the pilot
outage protection valve.
4. Remove the oven bottom assembly as outlined
in Covers, Panels and Handles.
5. Loosen the b-nut and remove the ignitor wire
from the bracket.