Toshiba RAS-09LAV-UL Air Conditioner User Manual


 
97
No. Part name
1) Follow to the procedure in the item .
2) Remove the two screws used to secure
the bearing base.
3) Remove the bearing base.
<Caution at assembling>
If the bearing is out from the housing,
push it into the specified position and then
incorporate it in the main body.
Two screws
Bearing
Bearing base
FILE NO. SVM-10019
Evaporator
(Heat exchanger)
7) Unscrew one screw which fix Electrical
Control Box and the casing. Move
Electrical Control Box until can see one
screw that fix Motor band and unscrew
it then remove FIX-EVA-DN
Bearing base
Procedures Remarks
Screw
Screw
Motor band
Screw
Tighten the screw of Motor band,
assembly Electrical Control Box then
tighten screw to complete reassembly.