Toshiba H6A-HLS Vacuum Cleaner User Manual


 
- 19 -
4.2 Electrical Operation
Electrical operations are performed as shown in the flow diagram below.
Motor begins operating
Springs begin tightening
Circuit breaker OPEN
Control power applied
Motor begins operating
Spring begins tightening
Springs ChargedMotor stops
Spring tautMotor stops
CLOSE signal given
CLOSE coil energized
Circuit breaker CLOSED
Auxiliary relay closes
Anti-pumping circuit completed
OPEN signal given
OPEN/TRIP coil energized
Spring status changes to yellow
CLOSE o
p
eration standb
y
Spring changes to white and switching
status changes to ON
Switching status changes to OFF
Next CLOSE operation is NOT possible
until the CLOSE signal is canceled.
Circuit breaker OPEN
Spring status changes to yellow