PREP DOOR FOR FOOT BOLT
23
Tear out template on page 16 to locate and drill holes for foot bolt.
Locate template on interior side of active panel towards inactive panel side.
Align line on template with edge of active door panel and tape into place.
Drill 1/8 dia. x 1 deep holes at hole locations shown on template.
Remove template.
""
ATTACH FOOT BOLT
INSTALL SILL CAP TOP
24
25
(1) #8 x 1 S.S. Pan Head
Sheet Metal Screw
Locate on bottom right corner
of the foot bolt.
½"
(3) #8 x 9/16 S.S. Pan Head
Sheet Metal Screws
"
Align foot bolt to pre-drilled holes in active slab
and fasten with the supplied S.S. pan head sheet
metal screws included with the foot bolt
Place a continuous bead of
clear sealant, to locations
shown, along entire length
of sill cap base.
Install sill cap top by
starting at each jamb and
working towards the center
of the door. Use a rubber
mallet to snap into place.
14
Sill cap top
Sealant
Sill cap base