Teledyne 6750 Carbon Monoxide Alarm User Manual


 
Maintenance Model 6750
Teledyne Analytical Instruments 52
Tighten three thumbnuts until
Source Assembly bottoms out on
squeeze nuts.
Recommend:
Use alternate tightening sequence
Insert lock-tight on three thumbnuts to prevent backoff.
Install insulation. Replace assembly as before.
Recalibrate NDIR (Section 4.3).
Note: IR Cell installed
incorrectly. Large outlet
port MUST go into
Detector Assembly (left)