STT40 / STT70
Start up 3-4
3.2. Continuous Operation
Note: To see a quick start guide for operation of this dryer see
chapter 14.
) Fill at least half of the drying hopper with material.
3.2.1. Switching the Dryer on
Turn on the dryers’ main power switch to the on position.
The “run” signal lamp turns on.
For operation with the optional timer clock:
Turn the “Timer” switch to the position.
For operation without timer clock:
Turn the “Timer” switch to the position.
The blower is running at this point.