Roberts Gorden CRV-Series Electric Heater User Manual


 
ROBERTS GORDON
®
CRV-SERIES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BE FORE INSTAL LATION AND OPERATION OF HEATING EQUIPMENT, READ AND UNDERSTAND T HE INSTALLATION, O PERATION AND SE RVICE MANUAL.
APPLICAT IONS, ENGINEERING AND DETAILED GUIDANCE ON SYSTEMS DESIGN, INSTALLATION AND PRODUCT PERFORMANCE IS AVAILABLE UPO N REQUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY I N ACCORDANCE WITH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTO R QUALIFIED IN THE INSTALLAT ION AND SE RVICE OF GAS-FIRED HEATING EQUIPMEN T.
VENTING
Vertical Venting Configuration
HORIZONTAL VENTING 4" (10 CM) PIPE
EP-100 Horizontal Venting Configurations
Approved
Vent Cap
Approved
Thimble
2' (610 mm)
Minimum
Aluminized Tee
1" (250 mm)
P.V.C to drain
system in
accordance
with local
codes.
Drain Cap
Clamps
Flexible Boot
6"(150 mm)
20" (510 mm) for EP-300
25' (8 m) and 3 Elbows Maximum
50' (15 m) and 3 Elbows Maximum
Bird
Screen
4" (10 cm) Single Wall Pipe
5" (12.5 cm) Single Wall Pipe
Vent Terminal
Tjernlund VH1-4
Vent Terminal
Tjernlund VH1-6
Approved Thimbles
5" to 4" Reducer
(12.5 mm to 10 cm)
6" to 5" Reducer
(15 cm to 12.5 cm)
18" (46 cm) Minimum -
40" (102 cm) Maximum
18" (46 cm) Minimum -
40" (102 cm) Maximum