Regency C34-NG2 Stove User Manual


 
Regency CLASSIC C34-2 Direct Vent Freestanding Gas Heater 15
INSTALLATION
DV STOVE HORIZONTAL VENT KIT (#946-116 & #946-216) INSTALLATION
DV STOVE HORIZONTAL VENT KIT
DV 2 ft. Stove Vent Kit (Part # 946-116) and DV 4 ft. Stove Vent Kit (946-216) include
all the parts needed to install the C34 with minimum horizontal and vertical vent
dimensions. For installations that require longer vertical and/or horizontal
vents use the Dura-Vent system as shown on page 17.
Qty. Description
1) 1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,
Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter
2) 1 Flex Liner, compressed aluminium 2 ply liner, 4" (102mm) inside diameter
3) 4 spring spacers
4) 1 90 deg. Elbow
5) 1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces
6) 1 Thimble Cover
7) 1 Wall Thimble (2 pcs.)
8) 1 Adapter
9) 1 AstroCap Termination Cap
10) 2 Trim Collar
11) 1 tube of Mill-Pac, high temperature sealant
12)12 Screws, #8 x 1/2" Self tapping, Stainless Steel
13)14 Screws, #8 x 1/2" Self tapping, Black
14) 4 Screws #8 x 1-1/2" Drill Point, Black
15) 4 Screws #8 x 1-1/2" Drill Point, Stainless Steel
16) 8 Wood screws #8 x 1"
Optional:
946-206 Vinyl Siding Standoff
for AstroCap
Note:
a) Liner sections should be continuous without any joints or seams.
b) This is an approved system, therefore components in this system must not
be substituted for any other manufacturer's products.
Review the following sequence of instructions
which are typical of most installations. The
sequence may vary depending on wall thick-
ness.
Refer to pages 6 to 10 for vent location and
clearance dimensions.
1) Set the unit in its desired location. Check to
determine if wall studs will be in the way of
the venting system, adjust location until all
clearances are met and there are no ob-
structions.
Note: A 1-1/2"(38mm) clearance around
the outer pipe must be maintained
except that only a 1" (25mm) clear-
ance is needed at the termination
end.
IMPORTANT:
Do not locate termination hood where
excessive snow or ice buildup may oc-
cur. Be sure to check vent termination
area after snow falls, and clear to pre-
vent accidental blockage of venting sys-
tem. When using snow blowers, make
sure snow is not directed towards vent
termination area.
2) Assemble a trial fit to determine the
vertical center-line for the vent termina-
tion.
a) Cut a 9-1/2" x 9-1/2" (241mm x 241
mm) square hole on both the interior
and exterior wall.
b) Install wall thimbles on both interior
and exterior wall with 4 wood screws
(#8 x 1") per thimble.
c) Attach the 2 piece adjustable pipe
section to the vent terminal and slide
into position from the exterior. The
larger diameter end of the ad-
justable pipe goes to the vent
terminal.
d) Install the 90
o
elbow onto the adjust-
able pipe to determine the vertical
centerline of the starter collar on the
unit.
Note: if the centerline cannot be
met, the adjustable sections will
have to be cut.