Pfaff 574 Sewing Machine User Manual


 
Adjustment
38
1.04.29 Lubrication
Requirement
After a running time of 10 seconds a fi ne line of oil should form on a strip of paper held
next to the hook.
Check whether oil has been fi lled in and that there is no air in the oil lines.
Let the machine run for 2-3 min.
While the machine is running do not place hands in the needle or hook area!
Danger of injury from moving parts!
With the machine running hold a strip of paper on the hook and check the requirement.
If necessary, adjust the oil fl ow on screw 1.
129-011
Fig. 1 - 29
1