![](http://pdfasset.owneriq.net/4/0f/40f9551e-25be-4873-8e34-a56a30e8818d/40f9551e-25be-4873-8e34-a56a30e8818d-bg27.png)
38
GAS-FIRED HEATER Installation Manual
HOSE BARB
DISTANCE NEEDED
TO DRAIN
INTO ANY POSITION
TO CLEAR BEAM
CONDENSATE LINE)
DETERMINED BY
AROUND OBSTRUCTIONS
1/4" NPT X 1/2"
(SUGGESTED SETUP FOR PIPING
(LENGTH DETERMINED
TUBING MUST
CAN BE ROTATED
TO ELIMINATE CONDENSATION)
6" IN DIAMETER
1/4" NPT X 1/2"
TOP VIEW
AROUND BEAMS IN ORDER
PIPING LENGTH
BY DISTANCE TO
FORM A LOOP
EXHAUST PIPING
HOSE BARB
1/2" ID CLEAR
FLEXIBLE TUBING
THE INTAKE VENT
BUILDING
STRUCTURE