8
OUTLINES AND DIMENSIONS
5
MXZ-2B20NA
Unit: inch
LIQ 1/4"FLARE
GAS 3/8"FLARE
Unit B
Unit A
LIQ
GAS
GAS
LIQ
1-3/16" 1/2"13"
2-5/8"
7-7/8"
9-7/16"
14-3/16"
11-3/4"
27-15/16"
1-3/16"33-1/16"
(Bolt Pitch)
3- (1-5/16") Drain Hole
4-(13/32"×13/16") Oval Hole
(Foundation Bolt M10)
Air
Discharge
Side Air Intake
Rear Air
Intake
1-7/32"
6-21/32"19-11/16"6-9/16"
17/32" 13/16"
9-3/16" 11-11/32"
21/32"
14-3/16"
2-1/2"
15-19/32"
11/16"11/16"
3- 7/8" Punched holes
(Connecting wire hole)
2-3/8"
1-3/16"
14-1/4"
5-5/16"
3-5/16"
1-25/32"
29/32"
1-5/32"
More than 3-15/16"
More than 19-11/16"
More than 7-7/8"
More than13-25/32"
More than 3-15/16"
More than 19-11/16"
More than 13-25/32"
More than 13-25/32"
More than 3-15/16"
SERVICE SPACE
More than 3-15/16"
More than 19-11/16"
Note : Leave front and both sides
free of obstruction.
Note : Leave front and overhead
free of obstruction.
Note : Leave rear, overhead and both sides
free of obstruction.
1.Installation space
2.Service space
Lock nut
Connector
Grounding terminal
Conduit
cover