Mamiya C24 Boiler User Manual


 
mini HE --- Installation & Servicing
61
INSTALLER
NOTIFICATION
GUIDELINES
IT IS A REQUIREMENT OF CORGI MEMBERSHIP
TO REGISTER EVERY GAS APPLIANCE
In addition a change to Building Regulations (England and
W ales) requires the installer to notify
when installing a heating appliance, as from 1st April 2005.
Complete the
Benchmark Checklis t
Choose Buildings
Regulations
notification route
If you notify via CORGI Scheme,
CORGI will then notify the Building
Control (LABC) who relevant Local
Authority Building Control (LABC)
scheme on members behalf
Competent Person’s
SELF CERTIFICATION SCHEME
BUILDING CONTROL
Contact your relevant Loc al
Authority Building Control (LABC)
who will arr ange an inspection or
contact a government approved
inspector
LABC will record the data and will
issue a certificate of compliance
Scheme members only:
Call CORGI on 0870 88 88 777 or
log onto:
www.corgi---notify.com
within 10 days
You must ensure that the
notifica tion number issued by
CORGI is written onto the
Benchmark Checklis t
CORGIwillrecordthedataandwill
send a certificate of compliance to
the property
IT IS A CONDITION OF THE
MANUFACTURERS WARRANTY
THAT THE BENCHMARK
COMMISSIONING CHECKLIST IS
FULLY COMPLETED AND LEFT
WITH THE APPLIANCE
Install and commission
this appliance to
manufacturers’ instructions