Heat & Glo LifeStyle BAY-38HV Indoor Fireplace User Manual


 
12
Figure 6. Vent System Components and Termination Kits
Step 3. Installing the Vent System
A. Vent System Approvals
These models are approved to use SL-series direct vent
pipe components and terminations (see Figures 5 and 6).
Approved vent system components are labeled for identifi-
cation. This pipe is tested and listed as an approved com-
ponent of the fireplace. The pipe is tested to be run inside
an enclosed wall. There is no requirement for inspection
openings at each joint within the wall. There is no required
pitch for horizontal vent runs. NO OTHER VENTING SYS-
TEMS OR COMPONENTS MAY BE USED.
Detailed installation instructions are included with each vent
termination kit and should be used in conjunction with this
Installers Guide.
The flame and ember appearance may vary based on the
type of fuel burned and the venting configuration used.
Identifying Vent Components
The vent systems installed on this gas fireplace may in-
clude one, two, or three 90°
elbow assemblies. The rela-
tionships of vertical rise to horizontal run in vent configura-
tions using 90° elbows MUST BE strictly adhered to. The
rise to run relationships are shown in the venting drawings
and tables. Refer to the diagrams on the next several pages.
NOTE: Two 45° elbows may be used in place of one
90° elbow. Rise to run ratios in the vent system must
be followed if 45° elbows are used.
Termination Kits
HORIZONTAL
TERMINATION
WALL FIRESTOP
90 DEGREE
ELBOW
VERTICAL
TERMINATION
STORM COLLAR
ROOF FLASHING
HORIZONTAL PIPE
SUPPORT
PIPE LENGTH
WALL BRACKET
CEILING
FIRESTOP
Figure 7.
NOTE: If the vertical vent component is 10 feet or more,
you may want to install the vertical baffle to improve flame
appearance. Vertical baffle kit (BAF-VERT) is located in
the manual bag. Center the vertical baffle on the four inch
flue and with self tapping screws secure the baffle to the
inside of the firebox (see Figure 7).
VERTICAL BAFFLE
KIT (BAF-VERT)
SLK-01D
SLK-TVCD
SLK-01TRD
PVK-80