Hearth and Home Technologies 4100I-NL-B Indoor Fireplace User Manual


 
Page 21
September 1, 2008
4100-I ACT WOOD INSERT
250-7201E
R
2
"
2-1/4"
1
1
2
2
4
4
4
4
4
4
4
4
4
4
6
6
4
4
5
5
5

The rebox is lined with high quality rebrick which has excep-
tional insulating properties. There is no need for a grate,
simply build a re on the rebox of your insert.
1. Be certain coals are completely cold. Remove all old
brick and ash from unit and vacuum out rebox.
2. Remove new brick set from box and lay out to THE
diagram as shown.
. Lay bottom bricks in unit.
4. Install rear bricks on the top of the bottom bricks. Slide
top of bricks under clip on back of rebox wall and push
bottom of brick back.
5. Install side bricks. Slide top of brick under clips on side
of rebox and push the bottom of the brick until it is ush
with the side of the unit.
BAFFLE REMOVAL & INSTALLATION
NOTE: The bafe material is 2700° Fiber Board. Removing hardware exposed to combustion processes can be frustrating. If
your reason for removing the bafe is simply to clean the chimney, you have alternatives which will save time and effort. Call
a qualied chimney sweep or an authorized Quadra-Fire dealer for details.
1. Remove all ash from rebox, and extinguish all hot embers before disposal into a metal container.
2. Remove ceramic blanket from above the bafe.
. With a /16” Allen wrench, remove 2 front manifold tube retainer bolts on the air channel under the end of the front tubes. NOTE:
Soak the bolts with penetrating oil for at least 15 minutes before trying to remove them. 
4. To remove manifold tubes, slide the tube to one side until one end is out of its hole. Then, while lifting that end of the ber board
bafe, pull tube up over the air channel and out of hole at the other end. It is necessary to remove the rst two tubes in order to
remove the bafe. NOTE: When replacing the manifold tubes, be sure the tube with the larger holes is placed in the front for
your insert to operate properly.
5. Slide ber board bafe forward to front of stove and straight out through door.

6. To install the ber board bafe, repeat steps 2 through 4 in reverse. Be sure the ber board bafe and ceramic blanket are
pushed back fully into position and the ceramic blanket lays at.
Ceramic Blanket
Baffle


Allen wrench
on retainer bolt
s
Item Brick Size Qty in Set
1 9 x 4-1/2 x 1-1/4” with hole 2
2 9 x 4 x 1-1/4” with cut 2
4-1/2 x  x 1-1/4” 1
4 9 x 4-1/2 x 1-1/4” 12
5 9 x  x 1-1/4”
6 9 x 1-1/2 x 1-1/4” 2
Use Part #82-0550 when ordering indi-
vidual brick and provide brick dimension
or copy this page and mark the desired
brick and take it to your authorized
dealer.