-26-
G0637/G0638 Cyclone Dust Collector
9. Secure the collection drum lids to the collec-
tion drums with the lid latches.
10. Connect the dust collection drum assemblies
to the funnel port with the 9" flexible ducts
and 9" duct clamps (see
Figure 38).
Figure 38. Dust collection drum assemblies
connected to funnel port.
Figure 40. Model G0638 control box bracket
mounted.
Figure 39. Model G0637 control box mounted.
Figure 41. Model G0638 control box mounted.
Note: The remote control uses IR (infrared)
to communicate with the control box, and
must have direct line-of-sight to the control
box. Locate the control box with this in mind.
Model G0638 Control Box
1. Mount the control bracket onto the lower
stand brace with (2)
3
⁄8"-16 x
3
⁄4" hex bolts, (4)
3
⁄8" flat washers, and (2)
3
⁄8"-16 hex nuts (see
Figure 40).
2. Open the control box and identify the four
mounting holes in the back of the cabinet.
3. Attach the control box to the bracket already
mounted on the stand brace with
(4) M6-1 x
15 Phillips head screws, (4) 6mm flat wash-
ers, and (4) M6-1 hex nuts (see
Figure 41).
Model G0637 Control Box
1. Mount the control box onto the lower stand
brace with (2)
3
⁄8"-16 x
3
⁄4" hex bolts, (4)
3
⁄8" flat
washers, and (2)
3
⁄8"-16 hex nuts (see Figure
39).