Friedrich HEAT PUMPS Heat Pump User Manual


 
20
920-087-04
I. Start-up Checklist
Inspect all components and accessories for
damage before and after installation.
Check installation for compliance with all national
and local codes and ordinances.
Read and follow all manufacturer's installation
instructions.
Check that circuit breaker(s) and electrical wire
sizes are correct. If the unit is supplied with a
power supply cord, insure that it is stored properly.
Check the condensate water drain outlet(s) to
make sure they are in compliance with all national
and local codes, that they are adequate for the
removal of condensate water, and that they meet
the approval of the end user.
Strictly follow installation instructions concerning
clearances around the unit.
Secure components and accessories, such as the
control door and front cover.
Check the unit air lter, condenser coil and
evaporator coil for any obstructions.
Check for proper operation of all components.
Instruct the owner or operator of the units
operation, and the manufacturer's
recommended routine maintenance schedule.
NOTE: It is highly recommended that a maintenance
schedule log book be prepared for recording
the dates and times of service.
Operate the unit for twenty minutes. Record
the unit's indoor/outdoor intake and discharge
temperatures, amperage draw, and power voltage.
Assemble the Warranty Certi cate, the Operation
and Installation Manual, all accessory installation
instructions and the name, address and telephone
number of the Authorized Friedrich Warranty
Service Company in the area for the owner or
operator.
NOTE: Units are to be installed, inspected, and checked by quali ed service personnel only.