Drolet SIT 0.820.634 Stove User Manual


 
ULTRA FLAME DIRECT VENT GAS STOVE 14
Direct Vent Kit for Floor Installation
1. Move the stove to its position;
2. Install temporarily an 8 in. section
(4) to visualize where the opening
is to be done thru the wall. Center
of the opening should be at about
23 ½‘’ above the base of the stove;
Note: Horizontal run should have a
slope of ¼ in per foot.
3. Make a 10-1/2" x 10-1/2" opening
in the wall, 23-1/2" inches in order
to introduce the radiation shield
thru the wall;
4. Cut the radiation shield to length if
necessary and install as shown.
Secure with four #10 x 1” wood
screws;
5. Install the vent terminal (13) with
2½ screws (12). You may want to
remove the vent casing for easy
access and manipulation, Keep
only in place the wall plate;
Floor Installation Details
6. Insert the 8 in. pipe into the round
opening of the interior black wall
plate (7). Fix the insulation pad (9)
around the 8 in. pipe with the
aluminum tape;
7. Keeping the insulation joint of the
8 in. pipe down, insert it into the
vent terminal wall plate;
8. Secure the 8 in. pipe to vent
terminal wall plate with the metal
screw;
9. Fix finally the vent terminal wall
plate with six 2 ½ in screws (12).
10. Insert the 4 in. flexible pipe (3) into
the 8 in. pipe and fix it to the vent
terminal flange. Use high
temperature silicone and one
locking band to secure it in place;
NOTE: All joints must be sealed with
RTV silicone, 315°C. (600°F)
temperature resistance.
CUT TO LENGTH
10-1/2" X 10-1/2"
OPENING