Desa VGC24NR/PR Electric Heater User Manual


 
www.desatech.com
119162-01C14
Pipe Cap Tee
Nipple Joint
Installation Items Needed
Before installing heater, make sure you have the
items listed below.
external regulator (supplied by installer)
piping (check local codes)
sealant (resistant to propane/LP gas)
equipment shutoff valve *
test gauge connection *
sediment trap
tee joint
pipe wrench
approved exible gas line with gas connector
(if allowed by local codes) (not provided)
* A CSA design-certied equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certied equipment shutoff valve from your
dealer. See Accessories, page 33.
For propane/LP units, the installer must supply
an external regulator. The external regulator will
reduce incoming gas pressure. You must reduce
incoming gas pressure to between 11" and 14" of
water. If you do not reduce incoming gas pres-
sure, heater regulator damage could occur. Install
external regulator with the vent pointing down
as shown in Figure 13. Pointing the vent down
protects it from freezing rain or sleet.
CAUTION: Use only new,
     -


 

  


Installation must include an equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up.
NPT tap must be upstream from heater (see
Figure 14).
IMPORTANT: Install equipment shutoff valve
in an accessible location. The equipment shutoff
valve is for turning on or shutting off the gas to
the appliance.
Propane/LP
Supply Tank
External
Regulator
with Vent
Pointing
Down
Figure 13 - External Regulator With Vent
Pointing Down
INSTALLATION
Continued
Check your building codes for any special re-
quirements for locating equipment shutoff valve
to replaces.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could result
in clogged heater valves.
    


* Purchase the optional CSA design-certied
equipment shutoff valve from your dealer. See
Accessories, page 33.
**Minimum inlet pressure for purpose of input
adjustment.
Figure 14 - Gas Connection (Remote-
Ready Models Only)
Gas
Control
3" Minimum
Sediment Trap
CSA Design-Certied
Equipment Shutoff Valve
With 1/8" NPT Tap*
Approved Flexible
Gas Hose (if
allowed by local
codes)
pROpANE/Lp
From External
Regulator
(11" W.C.**
to 14" W.C.
Pressure)
NATURAL
From Gas
Meter
(5" W.C.**
to 10.5"
W.C.
Pressure)