Desa VFRMV24NB, VFRMV24PB Water Heater User Manual


 
www.desatech.com
116412-01B 13
INSTALLATION
Continued
    
  


IMPORTANT: Make sure the heater burners are
level. If heater is not level, heater will not work
properly.
Installation Items Needed
control cover kit (provided with heater)
approved exible gas hose and ttings (pro-
vided with heater) (if allowed by local codes)
sealant (resistant to propane/LP gas, not
provided)
Note: Install optional HRC100 and HRC200
Receiver and Hand-Held Remote Control Kit
(see Accessories, page 26) before installing gas
log heater. See installation instructions included
with the kit.
1. Apply pipe joint sealant lightly to male
threads of gas tting (not provided). Connect
approved exible gas hose to inlet side of gas
control (see Figure 12).
2. Position heater assembly in replace.
3. Connect to gas supply. See Connecting To
Gas Supply.
Figure 12 - Attaching Flexible Gas Hose
to Heater Gas Regulator
Gas Control Valve
Flexible Gas Hose
(if allowed by local
codes)

   
    





Propane/LP
Supply Tank
External
Regulator
Figure 13 - External Regulator With Vent
Pointing Down
Vent
Pointing
Down
   
  

-
 


WARNING: Never connect

   
    

Installation Items Needed
Before installing heater, make sure you have the
items listed below.
external regulator (supplied by installer)
piping (check local codes)
sealant (resistant to propane/LP gas)
equipment shutoff valve *
test gauge connection *
sediment trap
tee joint
pipe wrench
approved exible gas line with gas connector
(if allowed by local codes) (provided)
* A CSA design-certied equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certied equipment shutoff valve from your
dealer. See Accessories, page 26.
For propane/LP units, the installer must supply an
external regulator. The external regulator will reduce
incoming gas pressure. You must reduce incoming
gas pressure to between 11" and 14" of water. If you
do not reduce incoming gas pressure, heater regulator
damage could occur. Install external regulator with the
vent pointing down as shown in Figure 13. Pointing
the vent down protects it from freezing rain or sleet.