PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG

1. Disconnect appliance with its appliance main
gas valve (control valve) and equipment
shutoff valve from gas supply piping system.
Pressures in excess of 1/2 psig will damage
heater regulator.
2. Cap off open end of gas pipe where equipment
shutoff valve was connected.
3. Pressurize supply piping system by either
opening propane/LP supply tank valve for
propane/LP gas or opening main gas valve
located on or near gas meter for natural gas
or using compressed air.
4. Check all joints of gas supply piping system.
Apply noncorrosive leak detection uid to all
joints. Bubbles forming show a leak.
5. Correct all leaks at once.
6. Reconnect heater and equipment shutoff
valve to gas supply. Check reconnected t-
tings for leaks.


1. Close equipment shutoff valve (see Figure 15).
2. Pressurize supply piping system by either
opening propane/LP supply tank valve for
propane/LP gas or opening main gas valve
located on or near gas meter for natural gas
or using compressed air.
3.
Check all joints from gas meter to equipment
shutoff valve for natural gas or propane/LP sup-
ply to equipment shutoff valve for propane/LP
(see Figure 16 or 17). Apply noncorrosive leak
detection uid to all joints. Bubbles forming
show a leak.
4. Correct all leaks at once.
INSTALLATION
Continued
Figure 15 - Equipment Shutoff Valve
Figure 17 - Checking Gas Joints
(Natural Gas Only)
Control Valve
Location
Equipment
Shutoff Valve
Propane/LP
Supply Tank
Equipment
Shutoff Valve
Gas Meter
Figure 16 - Checking Gas Joints
(Propane/LP Gas Only)
Control Valve
Location
PRESSURE TESTING HEATER GAS

1. Open equipment shutoff valve (see Figure 15).
2. Open main gas valve located on or near gas
meter for natural gas or open propane/LP
supply tank valve.
3. Make sure control knob of heater is in the OFF
position.
4. Check all joints from equipment shutoff valve
to gas control (see Figures 16 and 17). Apply
noncorrosive leak detection uid to all joints.
Bubbles forming show a leak.
5. Correct all leaks at once.
6. Light heater (see Operating Heater, page 16).
Check all other internal joints for leaks.
7. Turn off heater.
Equipment
Shutoff
Valve
Open
Closed