Desa Tech CGFB32CC Indoor Fireplace User Manual


 
www.fmiproducts.com
124970-01A 11
6. If using an optional perimeter trim kit,
install the trim after nal nishing and/or
painting of wall. See instructions included
with trim accessory for attaching trim.
7. Install and properly test gas log heater.
Follow installation instructions included
with the vent-free gas log heater that is
being installed.
IMPORTANT: When nishing your rebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc. may be butted up next to the sides and top
of the rebox. Combustible materials should
never overlap the rebox front facing.
WARNING: Do not allow any


IMPORTANT: Noncombustible materials such
as brick, tile, etc. may overlap the front facing,
but should never cover any necessary open-
ings like louvered slots.
WARNING: Do not allow
  


WARNING: Use only non-
   -

  

INSTALLATION
Continued
Figure 7 - Attaching Firebox to Wall Studs
Nailing
Flanges
Nails or Wood
Screws
INSTALLING FIREBOX USING
OPTIONAL ACCESSORY MANTELS
-


This rebox may be installed using a cabinet
mantel accessory against a wall in your
home. The rebox and cabinet mantel can
be installed directly on the oor. A trim kit is
included with the mantel accessories. Follow
instructions with mantel for installation.
INSTALLING GAS LINE
-


IMPORTANT: See Connecting to Gas Supply
in your log set owner’s manual for details on
gas hookup.
You may run the gas line from either side of
the rebox (see Figure 8). Decide which side
you want to run the gas line from.
Note: This is one option for installing shutoff
valve. Check local codes for equipment shut-
off valve location requirements.
Figure 8 - Installing Gas Line and
Equipment Shutoff Valve (Model May
Vary From Illustration)
Knockout
Locations
(Knock Out
One Hole)
Gas Line Hole
Equipment Shutoff
Valves (Install One)