9
DV360/580 Series Direct Vent Gas Fireplace
20010667
EB-1 Electrical Box
The fireplace, when installed, must be
electrically connected and grounded in
accordance with local codes or, in the ab-
sence of local codes, with the current CSA
C22.1 Canadian Electrical Code.
For USA installations, follow the local
codes and the national Electrical Code
ANSI/NFPA No. 70.
It is strongly suggested that the wiring of
the EB-1 Electrical Junction Box be carried
out by a licensed electrician.
Ensure that the power to the supply line
has been disconnected before commenc-
ing this procedure.
The EB-1 electrical junction box has been supplied
standard on the DV360/580 models to allow for the
easy installation of an optional fan kit.
To connect the EB-1 box to the house electrical supply,
follow the steps below.
1. Unscrew the retaining screw from the EB-1 base
plate (Fig. 9) and remove the EB-1 assembly from
the fireplace.
2. Remove the front cover of the EB-1 box.
3. Remove the plug socket assembly from the EB-1
box.
4. Feed the supply line in from the outside through the
cable clamp. (Fig. 9)
5. Connect black wire of the power supply line to the
brass screw (polarized) of the socket assembly.
6. Connect the white wire of the power line to the
chrome screw of the socket assembly.
7. Connect the ground wire of the supply line to the
green screw of the socket assembly.
8. Refit the socket assembly back into the electrical
box and replace the cover plate. Secure the cable
with the clamp on the outside of the unit to prevent
strain on the connections.
9. The EB-1 electrical junction box is now ready to sup-
ply power to the FK12 or FK24 fan kits if fitted.
FP580
INSTA VENT FREE
EB1 JUNCTION BOX
11/18/97
OUTSIDE
Electrical Box
FRONT OF UNIT
INSIDE
FRONT OF UNIT
FP580
Fig. 9 EB-1 receptacle.
Electronic Gas Control Valve
This appliance may be fitted with a Honeywell igni-
tion module.
Installation of the remote on/off switch on electron-
ic ignition units.
1. Thread the wiring through the holes on the side
panels of the appliance. Take care not to cut the wire
or insulation on metal edges. Route the wire to a
conveniently located receptacle box.
2. Attach the wire to the ON/OFF switch and install the
switch into the receptacle box.
3. Connect the white wire from the wall switch to the
black wire from the transformer, using an approved
wire nut. Connect the black wire from the wall switch
to the black wire running from the #6 position of the
ignition module, also using an approved wire nut.
PILOT
HONEYWELL IGNITION MODULE
WHITE
BLACK
BLACK
WHITE
NOVA SIT 822 VALV
E
HI
LO
POWER CORD
W/FEMALE SPADE
120 VAC RTN
WHITE
GREEN
BLACK
120 VAC HOT
BLACK
WHITE
24 VAC RET
40VA TRANSFORMER
24 VAC HOT
BLACK
WHITE
WALL SWITCH
WHITE
OFF
1 2 3 5 6 8 9
MV MV/VP PV GRD 24V SENSE SPARK
24V
WHITE
BLACK
FP1225
Fig. 10 Honeywell ignition module.