Burnham SCG Boiler User Manual


 
41
1. Do not exceed maximum vent/air intake lengths.
Refer to Table 4.
2. This installation will allow a maximum of ve (5)
feet vertical exterior run of the vent/air intake piping
to be installed on separate horizontal venting and
indoor air horizontal venting.
ECITON
tnelaviuqenidedulcniebotnurroiretxE
.shtgnelekatniria/tnev
3. Install vent piping.
a. Install vent piping for desired venting system.
Refer to speci c section for details for vent pipe
installation.
b. After penetrating wall/thimble, install an
AL 29-4C
®
90° elbow so that elbow leg is in the
up direction.
c. Install maximum of ve (5) feet of AL 29-4C
®
vent pipe. Refer to Sections C through E for
proper procedures for joining vent pipe and
ttings.
I. Optional Exterior Separate Horizontal Vent/Air Intake Terminal Mounting – See Figures 17, 18, 19, 20, 21 and 22.
d. At top of vent pipe length install an AL 29-4C
®
90° elbow so that elbow leg is opposite the
building’s exterior surface.
e. If installation requires indoor air, install
AL 29-4C
®
45° elbow (provided in indoor air kit)
to upper AL 29-4C
®
90° elbow so that leg of 45°
is in down direction (see Figure 21 or 22). If not
using indoor air, proceed to Step f.
f. Install horizontal vent terminal (provided with
boiler).
g. Brace piping if required.
4. Air Intake Piping (not required for indoor air).
a. Install air intake piping for desired venting
system. Refer to speci c section for details for
air intake installation.
b. After penetrating wall, install a corrosion
resistant 90
o
elbow so that elbow leg is in the up
direction.
c. Install maximum of ve (5) feet of corrosion
resistant air intake pipe.
d. At top of air intake pipe install air intake
terminal (provided with boiler).
e. Brace piping if required.
Figure17: Optional Separate Horizontal Air 3” or 4” Intake Terminal Installation