Bryant 551B Air Conditioner User Manual


 
Copyright 2005 Bryant Heating & Cooling Systems Printed in U.S.A. CL-1 CATALOG NO. 04-53551004-01
CUT ALONG DOTTED LINE
CUT ALONG DOTTED LINE
START-UP CHECKLIST
(Remove and Store in Job File)
I. PRELIMINARY INFORMATION
MODEL NO.: ______________________________________ SERIAL NO.: ___________________________________________
DATE:_____________________________________________ TECHNICIAN: _________________________________________
BUILDING LOCATION: ____________________________
II. PRE-START-UP (insert checkmark in box as each item is completed)
VERIFY JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
CHECK THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT
CHECK THAT RETURN (INDOOR SECTION) AIR FILTERS ARE CLEAN AND IN PLACE
VERIFY THAT UNIT INSTALLATION IS LEVEL
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING AND ORIFICE AND CHECK THAT
SETSCREW IS TIGHT
CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES OR
SHARP METAL EDGES
III. START-UP
ELECTRICAL
TEMPERATURES
PRESSURES
VERIFY THAT 3-PHASE SCROLL COMPRESSOR IS ROTATING IN THE CORRECT DIRECTION
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 43-45.
SUPPLY VOLTAGE L1-L2 L2-L3 L3-L1
CIRCUIT 1 COMPRESSOR AMPS L1 L2 L3
CIRCUIT 2 COMPRESSOR AMPS L1 L2 L3
EVAPORATOR FAN AMPS L1 L2 L3
OUTDOOR-AIR TEMPERATURE DB WB
RETURN-AIR TEMPERATURE DB WB
COOLING SUPPLY AIR DB WB
REFRIGERANT SUCTION, CIRCUIT 1 PSIG AT F (AT SERVICE PORT)
REFRIGERANT SUCTION, CIRCUIT 2 PSIG AT F (AT SERVICE PORT)
REFRIGERANT DISCHARGE, CIRCUIT 1 PSIG AT F (CONDENSER LIQUID LINE OUTLET TUBE)
REFRIGERANT DISCHARGE, CIRCUIT 2 PSIG AT F (CONDENSER LIQUID LINE OUTLET TUBE)