Avalon Stoves Stove Stove User Manual


 
Maintenance 29
© Travis Industries 4080725 100-01154
Daily Maintenance (whenever using the stove) - Continued
Door Opening
WARNING :
Make sure the
heater has fully
cooled
(approximately 25
minutes) before
opening the door
and conducting
service.
Phillips
Screwdriver
With the pawl free of the bracket,
the door may be swung open.
When securing
the door, make
sure the pawl fits
over the bracket
before tightening.
NOTE: Do not overtighten the pawl. This can
permanently damage the latch and
prematurely wear out the door gasket.
Door
Frame
Bracket (attached to side of
heater)
Pawl
Lock Nut