Avalon Stoves Arbor PS Stove User Manual


 
Maintenance 33
© Travis Industries 4070806 100-01191_000
Bi-Weekly Maintenance (or every 10 bags of pellets) - continued
Check Ashpan, Dispose if necessary
WARNING : Make sure the heater has fully cooled (approximately 25 minutes) before conducting service.
WARNING : The ashpan must be in place while the heater is in use.
Twist the ashpan
handle clockwise.
A handle is provided
on the ashpan to
remove the ashes.
Lift up on the
ashlip and slide
the ashpan
forward.
Disposal of Ashes Ashes should be placed in a metal container with a tight fitting lid. The closed
container of ashes should be placed on a noncombustible floor or on the ground, well
away from all combustible materials, pending final disposal. If the ashes are disposed of
by burial in soil or otherwise locally dispersed, they should be retained in the closed
container until all cinders have been thoroughly cooled.
Clean the Glass
Open the doors and clean the glass with a non-abrasive glass cleaner and rag.