Installation (For Qualified Installers Only) 15
© Travis Industries 4070806 100-01191_000
Installation Example: Interior Vertical Installation
Floor Protection
24” Minimum
Insulation
must maintain
3” clearance.
Outside air may be drawn from
a ventilated crawl space.
2” Min.
3” Min.
Ceiling Support / Fire Stop Spacer
Roof Flashing
Storm Collar
Vertical Cap
Vent must
maintain 3”
clearance to
combustibles.
“L” Vent
Seal each vent
section (including
adapters, elbows,
etc...) by injecting a
liberal amount of
500° F. RTV
silicone into the gap
between sections.
500° F. RTV
Silicone
Floor Protection
7” Minimum
6” Minimum
3”
Minimum
2”
Minimum
“Tee”