3M II 2529 Door User Manual


 
6
3.05 Check the cleave length using the 12.5 mm cleave length
gauges on the Fibrlok Assembly Tool. Adjust the cleaver to
provide the prescribed cleave lengths. Check cleave lengths
periodically during subsequent splicing operations.
Note: Do not allow cleaved end to contact tool. Do not clean
the fibers again after they have been cleaved.
4.0 Splice Assembly
4.01 Push the fiber down into the fiber retention pad on the proper
side of the splice.
Note: Hold the coated portion of the fiber ONLY. Do not allow
the cleaved end to contact any surface before insertion
into the splice.
4.02 Grasp the coated fiber about .25 inches (6 mm) from the bare
glass and move the fiber end onto the fiber alignment guide
on the assembly tool such that the end is resting on the
alignment guide outside of the splice.
Note: When splicing 250
m to 900 m coated fiber, always
insert the 250
m coated fiber first.
Note: Fiber should be placed in the retention pad and inserted
into the splice immediately following cleaning to
minimize exposure to the atmosphere and reduce the risk
of contamination.
Note: Push fiber
straight into fiber alignment guide,
NOT AT AN ANGLE.
250 µm 900 µm
250 µm : 12.5 mm
900 µm : 12.5 mm
900 µm : 14.0 mm