Installing the VCN Access Concentrator 19
Front Panel Connections
Refer to “Preparing the Site for the VCN Access Concentrator” on page
10 before connecting the VCN AC to the Ethernet switch Switch through
the front.
Figure 11 displays the rack after it has been wire connected.
Figure 11 Patch Panel and the Ethernet Switch Connected to the VCN Access
Concentrator
Figure 12 shows all the connections in the network.
TO PBXFROM NAU
VCN AC
Patch Panel
Flat Cable
24 RJ-45 conn
between VCN
and the Super
Switch 1100/3
JUHHQ
IODVKLQJ#JUHHQ
RII
#HQDEOHG/#OLQN#2.
#GLVDEOHG/#OLQN#2.
#OLQN#IDLO
6
6
7
7
9
9
8
8
:
:
;
;
<
<
43
43
44
44
45
45
4
4
5
5
6
8
4
7
:
9
;
5
46
46
47
47
48
48
49
49
4:
4:
4;
4;
4<
4<
53
53
54
54
55
55
56
56
57
57
6XSHU6WDFN#,,
66,,4433#6633
3C16 98 0
3DFNHW
3DFNHW
6WDWXV
6WDWXV
3RZHU26HOI#7HVW
9[:[
4;[ 4<[
4[
46[
45[
57[
SuperStack II
Switch 1100/3300
123456789101112131415161718192021222324
3