A SERVICE OF

logo

IN-9
Catalyst 2955 Hardware Installation Guide
78-14944-03
Index
W
warning labels
hot surface
2-6
illustrated 2-5
laser safety 2-6
warnings
chassis power connection
C-72
Class 1 laser product 3-5, 4-7, B-4
class 1 laser product C-49
Class 1 LED product 3-5, 3-65, 4-7, 4-50, B-3
class 1 LED product C-50
console cable connection C-24 to C-27
DC power 3-2, 3-17, 4-2, 4-21
ensure that the switch is grounded 3-4, 4-6
exposed DC power wire C-75
functional ground lug 3-4, 3-15, 3-32, 4-6, 4-18
ground connection 3-3, 4-5, C-42 to C-43
grounded equipment C-22 to C-23, C-66
hazardous locations
class 1, division 2 hazardous
location
C-29 to C-31
connecting and disconnecting cables 1-4,
4-5
console cable 1-6, 2-10, 4-5, 4-14, 4-16, 4-30, 5-2
disconnecting equipment 4-3
pollution degree 2 industrial
environment
C-33
port connection C-35 to C-38
power and relay connector 2-9, 4-3, 4-28
relay wires 2-16, 4-4, 4-33
safe operating voltage range 4-3
switch installation C-7
industrial environment 3-3, 4-4
installation 3-2 to 3-6, 4-2 to 4-7, C-3
installation instructions C-38
invisible laser radiation 3-5, 4-7, B-4
jewelry removal 3-4, 4-6, C-45
laser beam exposure 3-6, 4-7, C-56
laser radiation C-52
laser viewing 3-5, 4-7, C-54
lightning activity 3-5, 4-7, C-1
open type equipment C-18 to C-21
overtemperature 3-3, 4-5, C-27
product disposal 3-5, 4-7, C-47
qualified personnel C-68
remove power before
disconnecting
C-15 to C-18
restricted area C-69
SELV-IEC 60950 DC power supply C-44
service personnel 3-2, 4-2, C-39
servicing C-39, C-58 to C-66
stacking the chassis C-39, C-41 to C-42
supply wires 3-3, 3-32, 3-42, 4-4, C-32 to C-33
temperature 3-3
translated C-1 to C-76
wiring the relays 3-48 to 3-51, 4-32 to 4-36