York H*RD018 THRU 060 Air Conditioner User Manual


 
254892-YTG-C-0606
8 Unitary Products Group
PROCEDURES:
1. Unit factory charge listed on the unit nameplate includes refrigerant for the condenser, the smallest evaporator and for 15 feet of inter-
connecting
line tubing.
2. Verify the TXV and additional charge required for specific evaporator coil in the system using the above table.
3. Additional charge for the amount of interconnecting line tubing greater than 15 feet at the rate specified in the table above.
4. Permanently mark the unit nameplate with the total system charge. Total System Charge = Base Charge (as shipped) + adder for
evaporator + adder for line set.
G4FA036S14T2A 0 ––––
G4FA048S17T2A – 0
G4FA048S17T2C – 0
G4FA048S21T2A – 0
G4FA048S21T2C – 0
G4FA060S21T2C ––––0
G4FA060S24T2C ––––0
G4FD036H17T2A 0 0 – – –
G4FD036H21T2A – 0
G4FD042H21T2A – 0
G4FD042H21T2C – 0
G4FD046H17T2A – 0
G4FD046H17T2C – 0
G4FD048H21T2C – – 0 0 –
G4FD048H24T2C – 0 0 –
G4FD060H24T2C ––––0
G4FD061H24T2C ––––0
F4FP040H06T2A 0 ––––
F4FP042H06T2A – 0
F2FP048H06T2C – 0
FOOTNOTES:
1. Systems matched with furnace or air handlers not equipped with blower-off delays may require blower Time Delay Kit 2FD06700224.
Additional R-22 Charge / Orifice Size for Various Matched Systems - 3 Phase (Continued)
Outdoor Unit H1RD030S(25,46) H1RD036S(25,46) H1RD042S(25,46) H1RD048S(25,46) H1RD060S(25,46)
Required TXV 1TVM2A1 1TVM2A1 1TVM2C1 1TVM2C1 1TVM2C1
Factory R-22 Charge, lbs-oz 5 - 13 6 - 0 8 - 13 8 - 6 10 - 2
Indoor Coil
1
Additional Charge, Oz