Trane GEV Heat Pump User Manual


 
8 WSHP-SVX01D-EN
Dimensions/Weights
Clearance
GEH Clearance Dimensions
Access to the unit for service pur-
poses should be provided at instal-
lation. All 1/2 through 5 ton
configurations require an 18" (457
mm) surround clearance from oth-
er mechanical and electrical equip-
ment (where shown) to enable
panel removal from the unit for
service/maintenance ability. Some
local codes require a greater ser-
vice clearance than listed below.
Check all code requirements prior
to unit installations.
Equipment containing a same-side
supply/return combination re-
quires a 3" (229 mm) limitation on
one side. Access to the TXV may
not be possible with this 3" (229
mm) clearance. This configuration
is typically applied in a corridor in-
stallation, where space limitations
force the left or right side of the
unit against a wall.
Service clearance dimensions for
the 6 through 15 ton horizontal in-
cludes a two side access appropri-
ate for control and blower motor/
wheel access. Some local codes
require a greater service clearance
than listed below. Check all code
requirements prior to unit installa-
tions.
GEH 1/2 through 5 Ton Clearance
GEH 6 through 15 Ton Clearance