Toshiba RAV-SM1603DT-A Air Conditioner User Manual


 
– 145 –
No.
9
Part name
Reactor
assembly
Procedure
1. Detachment
1) Carry out works of 1 of
1
,
3
and
4
.
2) Remove lead wires connected to the terminal block.
3) Cut the bundling band which binds the rector lead
wires.
Remarks
Service reactor
N side
L side
Marking
No
Ye s
1. Assembly
1) Assemble the reactor with procedure 7) to 1).
XREQUIREMENTX
Arrange the reactor as same as that which is replaced.
4) Remove screws of the rector assembly.
(ST1T Ø4 × 8, 7 pcs.)
5) Lift up the reactor assembly and then remove it from
the main unit.
X CAUTIONX
The reactor assembly has heavy weight (9kg);
be careful for handling it.
6) Remove the reactor cover. (ST1T Ø4 × 10, 6 pcs.)
Note)
The lead wires pass through the square hole of the rector
cover. Therefore pay attention so that lead wires are not
damaged by edge when they are pulled out.
7) Remove the reactor. (ST1T Ø4 × 10, 4 pcs.)
Bundling band
Bundling band
Bundling band
Reactor lead
Reactor lead
Reactor lead
Reactor cover (A)
Reactor cover (A)
Marking (Red)
Marking (Red)
Screws
Screws
(at opposite side, also)
(at opposite side, also)
Reactor cover (A)
Screws
(at opposite side, also)
Screws
Screws
Screws
N side (Upper side)
N side (Upper side)
No marking
No marking
L side (Lower side)
L side (Lower side)
Marking
Marking
Marking (Red)
N side (Upper side)
No marking
L side (Lower side)
Marking