14
TESTING (Cont)
INSTALLATION VERIFICATION
Have both units been securely and firmly installed?
Are all piping connections secure?
Have the refrigeration lines been sufficiently insulated?
Have you verified the length of the connection pipes and the refrigerant capacity?
Have you conducted all leakage and system tests?
Does the unit drain properly?
Are all electrical connections in compliance with local standards?
Has the unit been properly grounded?
Is the power cord as specified?
Are all air inlets and outlets free from obstruction?