Reliance Water Heaters 606 Water Heater User Manual


 
17
Installing the New Water Heater (cont'd)
Venting (cont'd)
INSTALLATION SHOWING USE OF PVC, ABS OR
CPVC PIPE FOR INLET AND OUTLET VENT PIPING:
Inlet piping through any type wall.
EXTERIOR WALL
SILICONE
SEALER
SILICONE SEALER
SCREW
SCREW
SCREW
SCREW
SCREEN AT
OUTLET
FLUE MOUNTING
ADAPTOR
VENT CAP MUST
BE POSITIONED
DOWNWARD
1
1
2
MIN. EXTENSION
THROUGH
EXTERIOR WALL
FLUE MOUNTING ADAPTOR
CONNECTING VENT TO BLOWER
1.
If making an immediate horizontal run of vent off the
blower, one 3 PVC inlet and one 3
PVC (ABS for 75
Gal. Models and 50 Gal. 65,000 Btu/Hr Models)
outlet
Schedule 40 street elbows are required. Place the elbow
in the required direction on the blower and using 3 sheet
metal screws, attach the elbow.
2. If there is to be a vertical run of vent from the blower, the
3 PVC inlet and the 3
PVC (ABS for 75 Gal. Models
and 50 Gal. 65,000 Btu/Hr Models) outlet pipes must
be attached to the blower and venting hood, using 6
sheet metal screws.
CAULK
JOINTS
CAULK
JOINTS
VENT TO
OUTDOORS
INTAKE FOR
COMBUSTION AIR
FLUE PRODUCTS
DISCHARGE PIPE
AIR INTAKE
PIPE
INSTALLATION SHOWING USE OF (OPTIONAL)
DELUXE HORIZONTAL VENT KIT:
Typical installation.
If this concentric flue, through the wall type of venting sys-
tem is preferred, the vent kit can be ordered from the
Service Parts Dept. under kit #9002749. See also pages 34
to 37. Installation instructions are provided with the kit.
VENTING THROUGH A ROOF
Two 3inlet and outlet PVC Schedule 40 45° vent caps are
supplied.
A 5’ section of 3ABS Schedule 40 outlet vent pipe (75 Gal.
Models and 50 Gal. 65,000 Btu/Hr Models only) is sup-
plied. (More may be required and must be supplied locally).
1. The water heater requires its own (separate) venting
system.