6 E33 FPI Direct Vent Gas Insert
14) Install optional Excalibur Surround. See
page 15.
15) Install optional remote control or wall ther-
mostat, pages 17.
16) Final check (page 18): Before leaving this
unit with the customer, the installer must
ensure that the appliance is fi ring correctly.
This includes:
a) Clocking the appliance to ensure the
correct fi ring rate.
b) Adjusting the primary air, if required,
to ensure that the fl ame does not
carbon. See page 9.
c) Ensuring that the appliance is venting
correctly.
MATERIALS
REQUIRED
No electrical power supply is required for the gas
control to operate. A 120 Volt AC power cord is
hooked up to the fan. Plug the 3 wire cord into
a suitable receptacle. Do not cut the ground
terminal off under any circumstances. When
connected with 120 volts, the appliance must
be electrically grounded in accordance with
local codes, current version of the Canadian
Electrical Code CSA C22.1 (in Canada) or in
the absence of local codes, with the National
Electrical Code ANSI/NFPA 70.
NOTE: This unit is equipped with a heat
sensor thermodisc which will prevent the
blower from operating until the unit reaches
the correct temperature.
INSTALLATION
11) Due to high temperatures, the appliance
should be located out of high traffi c areas
and away from furniture and draperies.
Children and adults should be alerted to
the hazards of high surface temperatures,
especially the fi replace glass, and should
stay away to avoid burns or clothing ignition.
Young children should be carefully super-
vised when they are in the same room as
the appliance. Clothing or other fl ammable
material should not be placed on or near
the appliance.
INSTALLATION
CHECKLIST
Before installing vent system ensure that the
damper plate is open and secure to prevent
the damper plate from falling down and crush-
ing the liner.
The FPI Gas Insert is installed as listed
below.
1) Check all clearances to combustibles, see
page 7.
2) Make the gas connection. See page 8.
3) Install the 3" fl ue liner to the sliding connector
plate. See page 8.
4) Slide the unit half way into the fi replace.
5) Pull the vent connector plate through the
tapered brackets and fasten to the front
plate. See page 8.
6) Slide the unit fully into the fi replace.
7) Test gas pressure, page 9. Check aeration
system, page 9.
8) Install the optional brick panels. See page
9.
9) Install the log set. See page 10.
10) Assemble and install the faceplate and trim.
See page 13.
11) Install the standard fl ush door. See
page 14.
12) Install both louvers. See page 14.
13) Install optional full screen doors. See page
16.
MINIMUM FIREPLACE
OPENING
The minimum fi replace opening for the FPI
gas fi replace insert is shown in the following
diagrams:
WARNING:
Electrical Grounding Instructions
This appliance is equipped with
a three pronged (grounding) plug
for your protection against shock
hazard and should be plugged
directly into a properly grounded
three-prong receptacle. Do not cut
or remove the grounding prong
from this plug.
NOTE: If you are installing the Excali-
bur, the minimum fi replace dimensions
are as follows:
Width (at front): 34-1/2" (876mm)
Depth: 17-3/4" (451mm)
Height: 26" (660mm)
MINIMUM FIREPLACE
OPENING EXCALIBUR
OPTION
The minimum fi replace opening for the FPI
gas fi replace insert is shown in the following
diagrams:
Emissions from burning wood or gas could
contain chemicals known to the State of Cali-
fornia to cause cancer, birth defects or other
reproductive harm.