Premier Fire Alarm Control Panel Smoke Alarm User Manual


 
PREMIER SX USER MANUAL, MAINTENANCE GUIDE & LOG BOOK
Approved Document No: GLT.MAN-102
PAGE 2
Issue: 1.3 Authorised: GH Date: 9/6/2004
CONTENTS
1. FIRE ALARM CONTROL PANEL SAFETY ISSUES……………………………………… 3
How to use this Fire Alarm Panel safely
2. THE PURPOSE OF A FIRE ALARM SYSTEM……………………………………………… 3
Introduction to fire alarms
3. USER RESPONSIBILITIES & MAINTAINENCE OF THE FIRE ALARM SYSTEM, INCLUDING THE
FACP & ITS INTEGRAL PSE …………………………………………………………………… 4
What the end users responsibility is, including daily, weekly,
quarterly & annual checks
4. PANEL INDICATIONS & CONTROLS …………………………..………………………….. 5
A list of indicator LEDs & Control Buttons on the Premier SX Fire Alarm Panel
4.1 GENERAL CONTROLS
4.2 ACCESSED CONTROLS
4.3 SUMMARY OF LED COMBINATIONS AND THEIR MEANING
4.4 CHECKING THE PANELS INDICATION LEDS
5. THE FIRE CONDITION ………………………………………………………………………… 7
5.1 HOW THE PREMIER SX INDICATES AN ALARM
5.2 TO TURN OFF THE ALARM SOUNDERS
5.3 A SECOND ALARM SIGNAL FROM A NEW DETECTION ZONE
5.4 TURNING ON THE ALARM SOUNDERS FROM THE FACP (I.E. EVACUATE ).
5.5 RESETTING THE PANEL
6. THE FAULT CONDITIONS …………………………………………………………………. 8
6.1 DIFFERENT TYPES OF FAULT
6.2 WHAT TO DO IF A FAULT CONDITION OCCURS
7. DISABLEMENTS …………………………………..……………………………………… 10
7.1 REASONS FOR DISABLING CERTAIN PARTS OF A FIRE ALARM SYSTEM
7.2 TO DISABLE A ZONE AND/OR EXTERNAL SOUNDER
7.3 TO ENABLE A ZONE AND/OR EXTERNAL SOUNDER
8. USING SOUNDER DELAYS…………………………………………………………………. 11
8.1 WHAT IS A SOUNDER DELAY
8.2 SOUNDER DELAY SETTING
8.3 HOW THE PANEL INDICATES SOUNDER DELAY
8.4 A FIRE ALARM CONDITION ON A DELAYED PANEL
8.5 OVERRIDING A DELAY IN THE EVENT OF A GENUINE FIRE ALARM
8.6 RESET THE SYSTEM IN THE EVENT OF A FALSE ALARM
8.7 TO TURN OFF THE SOUNDER DELAY
9. SYSTEM DESCRIPTION ………………………………………………………….………... 12
Lists system comments
10. FIRE ALARM LOG BOOK………………………………………………………………….. 13
A place for you to record details of events such as fires, false alarms, call
outs, etc.
11 COMMISSIONING THE SYSTEM, INCLUDING P.S.E
.………………………………… 17
11.1 DESIGN, INSTALLATION & COMMISSIONING CERTIFICATES …………………… 17