Napoleon Fireplaces GT8N Indoor Fireplace User Manual


 
15
W415-0619 / B / 03.03.08
2” MIN.*
12”
MIN. TO
COMBUSTIBLES
(to ceiling or mantle)
1
1
/
2
” MIN.
* Any protruding finishing
material installed in this
space (ie. baseboards)
must leave 2” of
unobstructed clearance to
allow for full rotation of the
control door.
COMBUSTIBLE
NON-COMBUSTIBLE
1”
1”
0” IF
NON-COMBUSTIBL
E
FINISHING IS USED
SUCH AS BRICK AN
STONE.
BRICK
6”
MIN.
FIGURE 23
CLEARANCES TO COMBUSTIBLES
Minimum clearance to combustible construction from replace and vent surfaces:
Fireplace framing: - 6” to top
- 0” to stand-offs
(rear and sides)
Vent pipe: - 1”
Recessed depth: - 7”
Before the glass door can be removed, the optional frame/
front must be removed.
The glass door is secured to the top front edge of the rebox.
Pull the handles of the latches forward, then lift the hooks out
from the slots in the door frame to release the top of the door.
Then, pivot forward until the top edge of the door clears the
front of the replace. Next gripping the sides of the door lift
the door out from the retainer along the bottom of the door.
DOOR REMOVAL
FINISHING
OPEN
CLOSED
GLASS REMOVAL
Having removed the door, lay on a smooth at surface, face
down. There are 4 glass retainers that need to be bent away
from the glass to release it from the frame. Do not pry on
the glass.
When replacing DO NOT SUBSTITUTE MATERIAL, replace
the gasket (W562-0008) and the glass (W300-0088). Set
new glass into the frame and gently bend tabs into the
gasket to secure.
NOTE: Care must be taken when removing and disposing
of any broken glass or damaged components. Be sure to
vacuum up any broken glass from inside the replace before
operation.
FIGURE 24
GLASS
RETAINERS
GASKET
GLASS
FIGURE 25
FRAME
CONTROL DOOR
(OPEN POSITION)
WITHOUT FRAME INSTALLED
WITH FRAME INSTALLED