Munchkin VWH High Efficiency Hot Water Supply Boiler Boiler User Manual


 
GENERAL INFORMATION
7
GENERAL
1. Munchkin VWH is supplied completely assem-
bled as a packaged boiler. The package should
be inspected for damage upon receipt and any
damage to the unit should be reported to the
shipping company and wholesaler. This boiler
should be stored in a clean, dry area.
2. Carefully read these instructions and be sure
to understand the function of all connections
prior to beginning installation. Contact your
Heat Transfer Products, Inc. Representative or
the Heat Transfer Products, Inc. Customer
Service Department for help in answering
questions.
3. This boiler must be installed by a qualified
contractor. The boiler warranty may be voided
if the boiler is not installed correctly.
CODES & REGULATIONS
Installation and repairs are to be performed in strict
accordance with the requirements of state and local
regulating agencies and codes dealing with boiler
and gas appliance installation.
ACCESSIBILITY CLEARANCES
1. The Munchkin VWH is certified for closet
installations with zero clearance to com-
bustible construction. In addition, it is design
certified for use on combustible floors.
2. Refer to Figure 1.1 for the recommended clear-
ance to allow for reasonable access to the boil-
er. Local codes or special conditions may
require greater clearances.
COMBUSTION AND VENTILATION AIR
1. The Munchkin VWH is designed only for oper-
ation with combustion air piped from outside
(sealed combustion). PVC pipe must be sup-
plied between the air inlet connection at the
rear of the boiler through an outside wall.
2. No additional combustion or ventilation air is
required for this appliance.
3. Refer to Section 4 of this manual, Venting, for
specific instructions for piping combustion air.
PLANNING THE LAYOUT
1. Prepare sketches and notes showing the lay-
out of the boiler installation to minimize the
possibility of interferences with new or exist-
ing equipment, piping, venting and wiring.
2. The following sections of this manual should
be reviewed for consideration of limitations
with respect to:
a. Electrical Wiring: Part 2
b. Gas Connection: Part 3
c. Venting: Part 4
f. Piping the Munchkin VWH to the
Storage Tank: Part 5
WARNING
Liquefied Petroleum (LP) Gas or Propane is
heavier than air and, in the event of a leak, may
collect in low areas such as basements or floor
drains. The gas may then ignite resulting in a
fire or explosion.
CAUTION
Do not install this boiler on carpeting.
Figure 1-3
C. PRE-INSTALLATION REQUIREMENTS