30 Optional Equipment
Travis Industries 100-01135 4040809
LP Conversion Instructions
Install the conversion kit prior to installing the gas line to ensure proper gas use.
1 Open the door (see page 17). Remove the logs and coals (if installed - page 18)
2 Remove the burner (see illustration below).
d
NOTE:
Make sure the burner is
fully seated. When in
place, the pilot flame
must align directly above
the burner holes.
Pull the burner forward, out
of the firebox.
Slide the air shutters all the
way to the right before
installing the burner.
Make sure the mixing tubes
slide onto the orifices.
Mixing Tubes
Orifices
Replace the pilot hood
after replacing the burner.
Burner Replacement:
Make sure the burner is fully seated.
When in place, the pilot flame must align
directly above the burner holes.
a
Remove the cast floor.
Lift the pilot hood off the pilot
assembly (you may need to pull
hard to remove).
b
Lift the left side of the burner slightly, then slide it to the left
and lift it upwards (lift the burner from below).
Do not lift the burner from the pins.
WARNING:
The burner is fragile -
handle it with care.
c
Make sure the bolt head on
the bottom of the burner
inserts into this hole.