BIASI B/40
PAGE 18
1
2
3
4
5
6
7
8
9
1 On/Off Switch
2 Min. Boiler Temp. Thermostat
3 Max Boiler Temp. Thermostat
4 Thermostat By-Pass Button
5 Circulator Switch
6 Boiler On/Off Signal Lamp
7 Temperature Gauge
8 Manual Reset High Limit
9 Burner Lock Out Signal Lamp
* NOTE: If the thermostat test button is closed, the thermostats will be bypassed and the burner
will not shutoff until the boiler reaches the manual high limit.
The electricity to the boiler shall come from a dedicated breaker in the electric service box. A
service switch should be mounted on the side of the boiler so the burner man can service the burner
and controls. The electrical wiring should be routed so as not to interfere with normal servicing of the
boiler. Wiring done in the field between devices not attached to boiler shall conform with the
temperature limitations for type T wire (63F/35C) or other specified wire as applicable when installed
in accordance to manufacturer's
instructions and wiring diagrams.
Please refer to the wiring section of this manual for instructions on wiring the supplied control
panel.
13. Wiring: