LG Electronics PACKAGED TERMINAL AIR CONDITIONER/HEAT PUMP Air Conditioner User Manual


 
—30—
7. Position the condensate tube through existing hole (located
right side of blower deck).
8. Make sure the holes in the condensate tube are facing
inward toward the blower wheel.
9. Lower the discharge deck over the condensate tube and
screw the discharge deck to the chassis with the existing
screws. Replace the discharge screen and screw the
screen to the discharge deck with the existing screws.
10. Using the overflow tube holder and the overflow tube,
hold the tube with the metal holder and screw the holder
to the partition panel with the provided 1/2 inch #8 screw.
(Figures 30 & 31)
11. Place the pump bracket onto the end of the pump by
feeding the pump cord through the hole in the bracket and
pushing the bracket onto the threads of the pump. Slide
the supplied washer onto the threads of the pump. Screw
the pump nut onto the threads of the pump and tighten
the nut so that the bracket is secure against the pump.
(Figure 32)
12. Position the pump in the back left corner of the basepan
and screw the pump bracket to the basepan with the
provided two 1/2 inch #8 screws. (Figure 33)
13. Remove the protective adhesive backing from the plastic
U clip and mount the U clip to the plastic condenser
shroud in approximately the position shown. (Figure 34)
14. Snap the provided round plastic grommet into the top
condenser baffle. (Figure 34)
Condensate Tube
Screws
Holder
Tube
Figure 29
Figure 32
Figure 33
Figure 30
Figure 31