Lennox Hearth ULC-S610 Indoor Fireplace User Manual


 
INSTALLATION INSTRUCTIONS FOR MASONRY APPLICATION
WARNING: Before starting the installation, the masonry chimney
must be inspected by a qualified chimney sweep.
The following requirements must be respected:
1. The chimney must be absolutely clear of any soot residue or creosote.
Check for cracks, loose or missing bricks that could inhibit correct
installation of the liner.
2.Theclearancetocombustiblemustbeaminimumof1”betweenthe
outside of the masonry and any wood framing or loose insulation.
3. The chimney must be built in accordance with the current building
code.
4. No other appliance can be connected to the same chimney.
5.Theclearancestocombustibleforthesereplaceconnectorsare2”
onthesideandbottomand16”atthetop.
6. The connector parts are not necessary if the connection between the
insulated length and the stainless steel liner is done within the masonry
chimney.
Installation:
ThechimneymustberelinedwithastainlesssteellinermodelTUBINOX
or Projet SS of the same diameter as the outlet of the fireplace.
Forconnectionata30ºangle,aspecialconnector(BISUMA30)mustbe
used to connect the liner to the insulated chimney.
* IMPORTANT NOTE - The use of a 45º connector (BISUMA) is ap-
proved for use in Canada ONLY. Installations in the USA must use the
30º connector (BISUMA30).
Follow these steps:
1- Position the fireplace in its location. Temporarily install the ASHT+
elbow on the top of the fireplace and, using a level, mark with an oval
the location where the flue liner will enter the masonry chimney.
2- In the middle of the oval, drill a hole in the masonry chimney at 30º.
3-Increasethesizeoftheholeuntila30ºTUBINOXlinerelbowcanbe
easily slipped through.
4- Slide the liner down from the top of the masonry chimney until you
reach the hole level.
5- Slip through the hole a 30º liner elbow and connect it to the liner.
6- Add a small liner section to the liner elbow which will allow the liner to
extendatleast12”(measuredatthetopoftheliner)fromthemasonry
chimney.
7- Seal the opening around the liner with high temperature refractory
cement.
8- The next steps must be done in the following order:
See typical installation illustrated below.
A. Select the ASHT+ length that will fit between the elbow and the liner
sothatitwillslideatleast2”overthelinersection(Youmayneedto
cut the liner for a better fit).
B.TakethatsectionandtheBISUMA30coverandslideitovertheliner.
Make sure you have enough opening to be able to install the ASHT+
elbow without difficulty.
C. Install the 30º elbow on the fireplace.
D. Slide the length section back down on the elbow and twist lock the
two together.
E. Pull the cover down over the length and install the insulation pad over
the liner; be careful to cover the liner completely.
F. Slide back the cover over the insulation and fix it in place using the 3
metal screws supplied.
Figure 32
Fireplace
1” Clearance
* Insulated
30 Deg. Elbow
ASHT+ or HT6103+
3 Screws
Insulation Pad
and Cover
High-Temp.
Cement
Firestop
TUBINOX or Projet SS
Stainless Steel Liner
Insulated
Length
Masonry Chimney,
New or Existing
TUBINOX or Projet SS
Liner Must Slide at
Least 2” Inside Length
6’ 8”
NOTE:DIAGRAMS&ILLUSTRATIONSARENOTTOSCALE.